Search Results
Paul Smith, PE
Paul Smith serves as a Senior Project Manager in the Water Business Line at Tighe & Bond. He has
…
University Work: Cutting-Edge Facilities, Fields & More
How we are helping colleges, and universities improve their facilities with technology, reduce costs, and create spaces that promote healthy learning.
Roadway Revitalization Stimulates Economic Growth for Winchendon
Working with our engineers and MassDOT, the town reconstructed Central Street (Route 202) between Front Street and Maple Street.
Winchendon Central Street (Route 202) Reconstruction
The Central Street reconstruction project enhanced the appeal of downtown Winchendon and aided in the ongoing revitalization of the Town.
Colin Powers
Colin is a Project Manager specializing in wastewater and water projects. His experience includes design work, data analysis, report
…
Niantic Pump Station – 3D Scan to Revit Model
Tighe & Bond was retained by the Town to provide an existing conditions survey of the pump station using a 3D laser scanning tool, as well recommendations for mechanical piping improvements.
Welcoming New Hires in Our Water Business Line
Four new staff members bring their specialized expertise to our Water Business Line.
MassDEP Asset Management Planning
Tighe & Bond has worked with 28 towns in Massachusetts to secure over $4.1 million in grant funding from this program.
Integrated Water Resources Management Plan
Tighe & Bond served as Program Manager throughout the planning effort, playing a vital role in day-to-day communications with the City as well as guiding the project team.
Chicopee Integrated Wastewater & Stormwater Management Plan
The IMP identified and prioritized projects related to drinking water, wastewater, stormwater, and flood control.