Search Results

MassDEP Industrial Sewer Use Discharge Permitting Process

The 2014 changes to the MassDEP’s Sewer Connection Regulations (314 CMR 7.0) left many businesses wondering if they needed to obtain a new permit, renew their

Chicopee Sewer Separation

One City’s Holistic Perspective on Infrastructure Improvements

The City of Chicopee has been a longstanding client, beginning with the design of Chicopee’s wastewater treatment plant and most of its major sewers in the 1960’s through the mid 1970s. Although additional projects continued in the subsequent 20 years, our involvement really

2014 MA Sewer Rates Survey

Tighe & Bond began collecting water and sewer rate data in Massachusetts back in 1997. We have continued to

2013 CT Sewer Rates Survey

Tighe & Bond began collecting water and sewer rate data in Connecticut back in 1998. We have continued to regularly update and publish this data for

Three Questions With: Kristen LaBrie, GIS Project Manager

Kristen specializes in identifying and implementing GIS solutions for municipal and regional governments.

Seeking Responses for 2025 Massachusetts Water and Wastewater Rate Dashboard

Massachusetts utilities are encouraged to share their rate data with the UNC Environmental Finance Center by August 15.

Niantic Pump Station Upgrades Showcased in Case Study

The Town of East Lyme used 3D scanning & modeling to develop a model of existing conditions at the station, then design and implement upgrades.

Provincetown Police Station

The new station is a 13,900-sf, centrally located building which replaces an outdated facility susceptible to flooding.

Ribbon Cutting Marks Opening of Police Station in Provincetown, MA

The new station is a 13,900-sf, centrally located building which replaces an outdated facility susceptible to flooding.

2024 NEWEA Annual Conference

Join our staff at the NEWEA’s annual conference & exhibit from January 21-24 at the Marriott Copley Place in Boston.